Knob-and-tube wiring in the attic: what it is and California's insulation rules
Short answer
Knob-and-tube wiring is early electrical wiring: single conductors on porcelain knobs and through porcelain tubes, built to shed heat into open air. In California, insulation can go around it only if an electrical contractor certifies it in good condition, the certificate is filed, caution notices go up and the insulation is noncombustible.
Guide · · 4 sources, listed below ↓
Knob-and-tube is the wiring many older Bay Area houses were built with: single conductors strung between porcelain knobs and threaded through porcelain tubes, running separately through the attic and walls. It was designed to shed heat into open air. That's the whole reason insulation and knob-and-tube have a complicated relationship, and why California's electrical code has a specific rule for it.
This page covers how to recognize it without touching it, what the code says word for word, how Berkeley turns that into a form, what it means for the Title 24 energy rules, and the order the work has to happen in.
What knob-and-tube wiring looks like from the hatch
You don't need to climb in, and you shouldn't reach for anything. With a flashlight from the top of the ladder, look along the tops of the ceiling joists and the rafters:
- Porcelain knobs, usually white, fastened to the side or top of the framing, with a single wire wrapped or tied to each.
- Porcelain tubes where a wire passes through a joist or stud.
- Two wires running apart, often several inches from each other, rather than bundled together in one flat plastic or cloth-jacketed cable.
- Fabric or rubbery wire covering, often darkened, sometimes brittle.
Seeing knobs doesn't tell you whether the wiring is still in use. Some houses were rewired decades ago and the old runs were simply abandoned in place; others still feed lights and outlets through it. You can't tell which by looking, so treat every wire as live, and don't move insulation around it to get a better view. Take a photo and leave the rest to an electrician.
If you find a mix, with newer sheathed cable alongside knobs, that's common too. It usually means part of the house was rewired and part wasn't.
What the California Electrical Code says
The rule lives in section 394.12 of the California Electrical Code. Berkeley's Form 146, revised in March 2026 and citing the 2025 edition, prints it in full. Concealed knob-and-tube may not be used in "hollow spaces of walls, ceilings, and attics where such spaces are insulated by loose, rolled, or foamed-in-place insulating material that envelops the conductors."
Then comes the exception. Insulation isn't prohibited where knob-and-tube is present, provided all six of these are met:
- A survey and certification. The wiring is surveyed by an electrical contractor licensed by the State of California, who certifies that it is in good condition, with no evidence of deterioration or improper over-current protection, and no improper connections or splices. Any repairs, alterations or extensions need permits and inspections.
- Filing. The certification is filed with the building department, and the property owner gets a copy.
- Notices. Every accessible area where insulation has been installed around knob-and-tube is posted by the insulation contractor with a clearly visible notice that caution is required when entering. The notice is printed in English and Spanish.
- Noncombustible insulation, as the California Building Code defines it.
- Nothing conductive. The insulation can't have electrically conductive material as part of it or supporting it.
- Local permits still apply. The building department can still require permits and inspections for the insulation itself.
Item 4 is the one that narrows the choice of material. Whether a particular product meets the Building Code's definition of noncombustible is something to confirm from its documentation and with your building department, before it's ordered, not after it's in. For how the common attic materials behave around heat and flame in general, see whether attic insulation is flammable.
Berkeley's Form 146
Berkeley is one of the clearest examples in the Bay Area, because it puts the rule on a single page. The city says plainly that attics with knob-and-tube wiring may not be insulated unless a certification letter from an electrical contractor is submitted. Form 146, the Knob-and-Tube Wiring Safety Report, is that letter.
The certifying electrician fills in their company, state license number, city business license and license class, and ticks one of three boxes:
- The existing knob-and-tube wiring is in good condition, with no evidence of deterioration, proper over-current protection, and no improper connections or splices.
- The wiring is not in good condition and may not be covered without repair or rewiring.
- The wiring is disconnected and not live, or has been removed.
Copies of the completed form are posted in the attic before inspection, and the original goes to the building inspector at final inspection. Warning signs in English and Spanish go up at every attic access where knob-and-tube is concealed by insulation. The second page of the form is the sign itself: "WARNING: Knob and Tube Wiring. Use Caution When Entering Attic", with the Spanish text beneath it.
Other cities handle the paperwork their own way. Oakland, for example, runs insulation-only work through an insulation certificate. Wherever you are, the electrical code's conditions are statewide; the form is local.
The Title 24 exemption almost nobody mentions
Adding attic insulation normally brings in the 2025 Energy Code's altered-ceiling upgrades (the rules), and live knob-and-tube that stays is one of the exemptions.
The Energy Commission's 2025 compliance manual lists a few situations that are exempt from all of those upgrades. One of them is an attic with knob-and-tube wiring that is not being removed.
What that means in practice:
- If the knob-and-tube stays, the energy code doesn't require you to reach R-49 or do the other altered-ceiling items. But if you insulate around it, the electrical code's six conditions above still apply in full.
- If the knob-and-tube is removed or the house is rewired, the exemption no longer applies, and the altered-ceiling rules for your zone come back into play when insulation goes in.
Neither path is wrong. It's a decision about the wiring, made with an electrician, that happens to decide which insulation rules you're under.
The order of work
Getting the sequence right avoids paying twice. Insulation laid down before the electrician has been through often has to come back up.
- Spot it. From the hatch, or at an inspection. If we find it, we stop and refer you to an electrician; Attic WISE doesn't do electrical work.
- Electrician's survey. A California electrical contractor, the C-10 classification, surveys the wiring and gives a written finding: good condition, needs repair or rewiring, or disconnected or removed.
- Repairs or rewiring, if needed, under their own permit and inspection.
- Certificate filed with the building department, copy to you. In Berkeley, that's Form 146.
- Insulation, chosen to meet the noncombustible and non-conductive conditions if the wiring stays live, or to meet the altered-ceiling rules for your zone if it's been removed.
- Notices posted at each attic access in English and Spanish, where insulation now covers live knob-and-tube.
- Building department inspection, with the form posted in the attic.
If you're planning a rewire anyway, it's usually simplest to finish it before the attic is insulated, while the electrician can still see and reach everything.
Walls are a separate question
Knob-and-tube often runs through the walls as well as the attic, and the same code section covers wall cavities. Filling closed walls around live knob-and-tube needs the same survey and conditions. The wall insulation page covers how closed walls get insulated once that's settled.
Next steps
If you think you've seen knob-and-tube, take a photo from the hatch and leave it be. Then talk to an electrician before anyone quotes insulation. When their part is done, book a free inspection and bring their written finding; it decides which materials and which code rules apply. For other loose-fill questions, see blown-in insulation, and if the wiring is one of several old-house questions, insulating older Bay Area homes takes them era by era.
Questions people ask
Can you insulate over knob-and-tube wiring in California?
Only through the exception in California Electrical Code 394.12. An electrical contractor has to survey the wiring and certify it's in good condition, the certificate goes to the building department with a copy to the owner, caution notices in English and Spanish go up at the attic accesses, and the insulation must be noncombustible and contain nothing conductive.
What is Berkeley Form 146?
Berkeley's Knob-and-Tube Wiring Safety Report. The certifying electrician fills it in and picks one of three findings: the wiring is in good condition, it isn't and can't be covered without repair or rewiring, or it's disconnected or removed. Copies are posted in the attic before inspection, and the original goes to the building inspector at final.
Does knob-and-tube wiring change the Title 24 requirements?
Yes. Under the 2025 Energy Code's compliance manual, an attic with knob-and-tube wiring that is not being removed is exempt from the altered-ceiling upgrades, such as R-49, air sealing and recessed-light covers. The electrical code's conditions for insulating around the wiring still apply.
How do I know if my house has knob-and-tube wiring?
From the attic hatch, look for single wires running separately between white porcelain knobs fastened to the framing, or passing through porcelain tubes in the joists. Don't touch or move anything to get a better look, and assume any wire is live. An electrician can tell you whether it's still in use.
Does Attic WISE do the electrical survey?
No. Attic WISE doesn't do electrical work or the survey. If we find knob-and-tube wiring, we stop and refer you to an electrician, and the insulation work picks back up once the electrician's part is done.
Sources
- Knob-and-Tube Wiring Safety Report, Form 146, quoting California Electrical Code 394.12 (City of Berkeley, last revised 03/25/26) (opens in a new tab)
- 2025 Single-Family Residential Compliance Manual (CEC-400-2025-005), California Energy Commission (opens in a new tab)
- Description of Classifications (C-10 Electrical Contractor), Contractors State License Board (opens in a new tab)
- Re-Roofing and Insulation Certificates, City of Oakland (opens in a new tab)
General information, not legal or code advice. The official word: City of Berkeley Form 146, quoting California Electrical Code 394.12 (opens in a new tab).
Published by: Attic WISEUpdated:
Facts on this page were last checked against the sources on October 23, 2026.
Read next
Pages that pick up where this one stops.
Title 24 attic rules
The attic insulation R-value California's 2025 Energy Code (Title 24) requires when you add or replace insulation in climate zones 2, 3, 4 and 12, and the R-38 rule.
Existing-wall insulation
Insulation blown into closed walls through small holes, patched afterward.
Blown-in insulation
Fiberglass or cellulose, blown in to the depth written on your quote.
Older homes, era by era
A 1910 house and a 1975 house both count as old. What you'll find in their attics, and what has to happen first, is very different.
Is it flammable?
Glass, stone, paper and plastic all get called insulation. They behave very differently near heat, and in a wildfire the weak point isn't the insulation.
Let's go look at your attic.
Start with your ZIP code. A few questions later you'll have a Bay Area market range, and you can pick a time for a free inspection.
What happens next
- 1
Price range online. The estimator gives you a Bay Area market range in a couple of minutes.
- 2
Free inspection. In your home, or from photos or video you send if you'd rather skip the visit.
- 3
Written quote. What comes out, what gets sealed, what goes in.
- 4
Install day. Done by our own crews.
- 5
Cleanup. Old material bagged and hauled away, the work area cleaned.
- No deposit until you sign, and never more than 10% of the contract or $1,000, whichever is less.
- Every customer gets five business days to cancel after signing.
- Materials carry the manufacturer warranty.
Rather talk it through?(760) 655-5959